01.10.2012 Handing over new construction sites (Sluice Gate 4 and Ho Be dyke) to the contractor.
05.10.2012 Mud density sampling and mud level monitoring at wavebreaker and Nopol.
16.10.2012
On the way
19.10.2012 Sluice Gate 4
22.10.2012 Vinh Tan, Sluice Gate 4
30.10.2012 Marking poles in Ho Be dyke and checking at sluice gate 4.