Friday 30 November 2012

Construction in Vinh Chau - November 2012


02.11.2012 Handing over to the contractor at Sluice 2 and 3







06.11.2012 Sluice gate 2 and the wavebreaker







 




10.11.2012 Testing with dredger at Ho Be dyke, visiting bamboo walkway in Au Tho B












11.11.2012 Checking at Sluice Gate 4













13.11.2012 Tension testing at Ho Be dyke and marking poles at sluice gate 4









16.11.2012 Ho Be dyke and exchanging SD cards for wave censors at Nopol












18.11.2012 Ho Be dyke and sluice gate 4









19.11.2012 Ho Be dyke and sluice gate 4















21.11.2012 Installing censors at sluice gate 4






23.11.2012 Introducing construction sites at sluice gate 2, 3, 4 to Paul












30.11.2012 Sluice gate 3 and 4